92
Bergère has been designed for both single and
multi-occupant use. Thanks to its mechanical
smoke extraction system, the property of fers
high f lexibility in how f loors are organised –
whether in open-plan or partitioned layouts.
FIRE PROTECTION:
The main establishment is equipped with a
Category A f ire safety system and a Type 1
alarm system. The central control panel will be
located in the security control room near the
main entrance on Rue Bergère. An automatic
f ire detection system is included.
FACADE AND APERTURES:
The façades and roofs of Bergère are listed in
France’s supplementary inventory of Historical
Monuments. Exterior façades will be cleaned,
and interior walls will be lined with insulation to
meet thermal regulations.
Existing external windows and frames will be
refurbished or replaced. As part of ef forts to
minimise carbon footprint, we have devised
an innovative refurbishing process for external
windows and frames to achieve performance
levels equivalent to new units. There are three
types of window frame (wood, aluminium and
steel) within the building complex.
Two new access points will be created on the
Rue du Conservatoire façade:
-One near the corner with Rue Bergère, featur-
ing a lift for persons of reduced mobility,
Another near Rue SainteCécile designated as
an emergency exit
The Rue SainteCécile façade features three
arches opening onto two courtyards the Cour
dHonneur and the Cour SainteCécile The pro
ject includes a fourth arch to link the Imprimerie
garden with the ground f loor bike facility
Reduced mobility access will be either via the
Rue du Conservatoire or via the arches from
Rue SainteCécile
Internal fabric blinds with motorised adjustable
slats will provide solar shading in off ice areas
The three existing glass roofs covering the
courtyards have been retained The largest of
these spans the Salle des Pas Perdus, and has a
double-layer design with an accessible mainte-
nance space in between.
New skylights have been added in select roof
areas to enhance natural lighting in the up-
per-level off ices surrounding the Imprimerie
garden.
ELECTRICAL WIRING
The building complex is currently powered by
the ENEDIS high-voltage network, with a dual
supply conf iguration under the “Tarif Vert”
rate. The delivery substation will be located
on basement level -2. It supplies three trans-
formers, each with a power rating of 1,250 kVA.
Each third-party public building will be inde-
pendently supplied directly from the ENEDIS
network at a rating above 36 kVA, under the
“Tarif Jaune” rate.
The electrical architecture allows the building’s
operation to be compartmentalised.
The entire complex is equipped with a 1,540
kVA emergency generator, of fering up to 36
hours of autonomy.
The building’s main low-voltage switchboard
includes a 20% power and space reserve to
allow for future expansion of the electrical
installation.
Power distribution will be provided by distribu-
tion panels. Each functional area will have its
own distribution panel.
From the f irst to the third f loor, power will be
distributed to workstations via the raised f loor
system. From the fourth to the sixth f loor, pow-
er to workstations will be distributed via cable
trays in the ceiling, then via peripheral trunking
along the façade.
Power to feeders is distributed via prewired
quick-connect boxes. Each supplied feeder
includes 3 standard sockets (one feeder per
10 m² of off ice space).
The electrical safety installations in the main
building will be supplied directly from the Safety
Distribution Board SDB installed as part of the
renovation works
The following safety equipment will be powered
from the SDB
Fire safety systems
Smoke extraction fans
Smoke ventilation fans
Lifts used for evacuation
Sump pumps
Etc
All lighting across the building including in
plant rooms communal areas and car parks is
LEDbased In the off ices suspended lights will
be equipped with motion sensors daylight sen
sors or timers In the washrooms lighting will
be provided by spotlights activated by motion
sensors
BMS (BUILDING MANAGEMENT SYSTEM)
An open-protocol Building Management
System (BMS) will be installed to supervise the
building’s technical equipment. In particular, the
BMS will control comfort settings for lighting,
HVAC systems and blinds across the off ice f loor
space.
Supervised systems:
•Electrical equipment relating to: power deliv-
ery, transformation, and distribution; lighting
distribution panels and all-purpose small-power
panels,
•Thermal systems for: chilled and hot wa-
ter production and distribution; air handling
systems (AHUs, chillers, air conditioning units);
plumbing systems (lifting pumps, water treat-
ment, cold and hot water distribution, pressuri-
sation, etc.),
•Miscellaneous systems including mechanical
vertical transportation (lifts, goods lifts, etc.)
and safety equipment such as the f ire alarm
control panel,
•HVAC terminal units, managed based on oper-
ational mode (occupied, unoccupied, standby),
ambient temperature, CO
2
levels, dew point
sensors, and window contact sensors, etc.
•Lighting, controlled by motion sensing,
ambient light levels (with dimming capability),
user-def ined settings and override functions,
•Blinds operated by user controls.
SMOKE EXTRACTION
Smoke extraction will be mechanical in all the
off ice areas from garden level to the f ifth f loor,
and also in the f itness centre, the auditorium
and its adjoining corridor, lobby and foyer, the
vault corridor and the multi-purpose room.
This excludes the Salle des Pas Perdus and
coworking atrium areas, which are subject to
specif ic smoke extraction engineering studies.
HEATING AND COOLING
Hotchilled water production
Production of hot and chilled water is han
dled by connections to the CPCU Compagnie
Parisienne de Chauf fage Urbain and Fraîcheur
de Paris networks Heating and cooling in
the off ice areas are provided mainly through
microperforated radiant panels integrated into
ceiling soff its Some areas are additionally treat
ed with fan coil units
Off ice space temperature setpoints
Winter 19C
Summer 26C
Comfort setpoint variation 2C
PAGE 92
BREAKDOWN OF OCCUPANCY BY SERVICE SPACE
FLOORS
ADDITIONAL OCCUPANCY*
PERS.
GROUND FLOOR-
GRANDE BRASSERIE 330
Garden level-
BUSINESS CENTER 100
FITNESS 75
AUDITORIUM 200